After yet another hiatus the plumbing lads have been in. Their first job was to put down the floor insulation. This was all done yesterday, and the pictures below show this and one of the valve sets for the underfloor heating.
Today they have put down just under 1000m of piping, and have filled and pressure tested it.
On the left, the kitchen and above the living room.
Quite what part the dustpan plays in this modern technology is tricky to work out.
No comments:
Post a Comment