The ground floor is walled out and the first floor balcony is supported prior to the reinforced concrete going down. The black pipes are steel pillars with concrete inside and their steel reinforcements linked to the ground floor and the balcony. The following two pictures were taken at 14.00 and 17.00. The first floor concrete beams are in ready fro the blocks tomorrow. No hanging about here!